The Big Pour, First Floor

With 55-degree temperatures, nature cooperated on Feb. 10, 2022, as we poured the concrete slab for the main floor immediately adjacent to the existing Montana Historical Society building.

Share The Big Pour, First Floor on Facebook Share The Big Pour, First Floor on Twitter Share The Big Pour, First Floor on Linkedin Email The Big Pour, First Floor link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>